Apex Heat App updates

Changes made to Apex Heat App, by date: new features, improvements, calculation changes and fixes. Calculation changes are marked separately because they can change the results of properties you have already calculated.

  1. Improved

    An existing energy certificate can now be imported from a scanned PDF or photos of its pages

    Reading an existing energy certificate has improved significantly: you can now also upload a scanned PDF or photos of the certificate, and Claude Opus 5.5 reads it into the same fields as a digital PDF. The values are shown for review in the same way before they are applied. A read usually takes 30–60 seconds per certificate and carries on if you leave the page. Values the model is unsure of are marked for checking.

  2. New

    Savings from ventilation controls and equipment renewal are now calculated machine by machine

    Two new Beta cards in Investments and measures calculate ventilation schedule optimization, airflow rebalancing, demand-controlled ventilation retrofit and repair, weekend airflow reduction, supply-air temperature reset, EC fan retrofit and ventilation unit replacement. The results show each machine's saving as heat, electricity, carbon dioxide and euros, and the measures are calculated one after another so that no saving is counted twice. The controls measures have no default price, so the contractor's price is entered right under the measure.

    The Ventilation controls and adjustment card with its Beta badge and its six measures to tick
    Read more
  3. New

    A ventilation unit's model can now be picked from a catalogue of residential units sold in Finland

    The model gives the unit's heat recovery temperature ratio and SPI with their source, and a unit can be given an identifier, the spaces it serves and audit details, which the report's ventilation unit table shows. The current and the new schedule can be entered as runs with airflow levels, as an hour grid or as text, and standstill weeks are picked week by week. The schedule change offers example schedules, and choosing CO₂ control calculates a demand-controlled ventilation retrofit for the building.

  4. Other updates

    • Improved: The E-number's demand-controlled ventilation reduction can now come from the ventilation plan
    • Improved: Small updates to the energy subsidy following the latest version (v3) of Varke's application guide
    • Improved: Heating and solar can now be sized on the consumption after LED relighting
    • Improved: A field now shows when its choice overrides values you typed in other fields
    • Improved: Every map now shows a scale bar in its lower right corner
    • Improved: The energy certificate splits a shared heating plant's outdoor pipe and tank losses by building
    • Improved: The AI assistant answers regulation questions, draws the drilling map and searches the EPC register
    • Improved: Boreholes, start points, collectors and the plant room can be moved on the drilling map
    • Improved: The drilling price per metre can be entered by well depth
    • Improved: A heat pump's results show its power coverage and bivalence point at the design temperature
    • Improved: Several buildings can share one electricity connection, and a heat pump can have its own meter
    • Calculation change: The energy certificate's E-number was refined for thermal bridges and heat recovery
    • Calculation change: The certificate reads structures with no renovation year or U-value at the permit year's U-values
    • Fixed: A yearly consumption table can now be imported with the years across a row instead of down a column
  5. New

    LED relighting can now be calculated by lighting zone

    Give each zone its current lighting and its new LED lighting. The results and the report show each zone's saving, cost and payback time. The saving is net of the added heating, since LED lights warm the rooms less.

  6. Calculation change

    The ground-source drilling cost now includes the trench to the building

    The drilling price now includes the trench from the boreholes to the building and the collector wells. The trench shows on the drilling map and in the report, and the drilling, trench and collector well prices can be entered from a contractor's quote. In most buildings the investment changes little, since digging was already priced per borehole before, and it rises most where the boreholes stand far from the building.

  7. Improved

    The drilling area can now be edited on the map

    Drag the drilling area's corners on the map, or click a neighbouring parcel to open it for boreholes. When a field lands on such ground, the map and the report remind you to check underground services and wells. Neighbouring buildings are now left out of the rig's area, which can change drilling results.

  8. New

    EV charging can now be calculated for housing companies

    Choose charging readiness, turnkey charging or converting the heating posts, and enter the building's parking spaces. The results and the report show the investment, the yearly fees, what charging adds to the housing company's electricity bill, and whether today's grid connection is enough and what enlarging it costs, with and without load management. The car users pay for the charging energy, so it does not show in the housing company's consumption, emissions or energy class.

  9. New

    Three measures that cut the district heating power charge are now calculated

    The contract power review shows the saving from lowering the contract power to the peak the buildings need, and costs nothing. Peak shaving calculates how much a storage tank cuts the peak and can add a demand response credit to the saving; return water cooling saves where the tariff is based on water flow. Heat consumption does not change, only the power charge.

  10. Fixed

    The energy subsidy is calculated without air tightness and SFP measurements

    Varke confirmed in writing that the subsidy's E-numbers must not mix table values with measured ones. The subsidy's threshold and the improvement over the current state now use the E-number without its air tightness and SFP measurements, so a building where only the measurements are recommended gets none. The E-number in the results, the certificate and the reports still credits the measurements.

  11. New

    Air-to-air heat pumps are now calculated as an investment option

    For a building without a heat pump, air-to-air heat pumps can be calculated with a chosen model and number of units, alone or with an exhaust air heat pump. They heat beside the existing system, which still makes the hot water and the rest of the space heat, and in the energy subsidy they take the 40% heat pump row. The options are off by default, so saved projects' results do not change until they are switched on.

  12. Calculation change

    Borehole fields are sized with the brine temperature model instead of a yield-per-metre table

    A field's yield per metre is calculated from the field's number of holes and depth and from the area's climate, unless you enter the yield yourself. The brine temperature is also calculated month by month from the climate instead of a fixed 3 °C, so the ground source sCOP changes.

  13. Improved

    Boreholes can be placed on the street and park land beside the lot

    Two new options add land beside the lot to the drillable area, with the city's permission: either the street halfway to the opposite lot plus a narrow strip of the adjacent park, or the whole adjacent park near the lot. With the first, drill starts stay on the lot and the holes are drilled at an angle, and a large lot that already fits enough boreholes gets no street or park land added.

  14. New

    A heat pump model can be chosen from a list of manufacturers' real models

    A sizing-table row can take a ground-source or air-to-water model, and a number of units of it, from a catalogue fitted to manufacturers' published data: 145 ground-source and 67 air-to-water pumps. The calculation uses the chosen model's COP, operating limit and cold-weather output, so the row's sCOP and coverage are the model's. When the building's existing heat pump is chosen from the catalogue, today's heating and the baseline for savings run on that model.

  15. Other updates

    • Improved: The solar array's size can be entered in kilowatt-peak
    • Improved: The energy subsidy can be calculated for investments you choose
    • Calculation change: The boreholes' distance from a neighbour's plot grows with their depth
    • Calculation change: Window and door renewals default to U-value 0.70 W/(m²K), so they count towards the energy subsidy
    • Calculation change: Heat pump COP curves were fitted to manufacturers' measurements
    • Calculation change: Current electricity cost rises where a building has a heat recovery machine
Show the whole year